WHEE Signs a Hundred-Million-CNY CFB Order in Indonesia
来源: 作者:
On March 4, 2025, WHEE signed a supporting project contract for a thermal power plant with Qili Aluminium of Malaysia. The project includes 4 sets of 220t/h circulating fluidized bed (CFB) boilers, with the project amount exceeding 100 million CNY. This project is the largest EPC (Engineering, Procurement and Construction) project of the company in Indonesia so far.

The project plans to build an alumina plant in West Kalimantan Province, Indonesia. This move marks a further expansion of Qili Aluminium in the upstream of the aluminium industrial chain. Qili Aluminium is the largest aluminium industrial group in Southeast Asia. The project includes a power plant, a wharf and supporting infrastructure. The total cost of the first phase is approximately 5.4 billion CNY. The expected annual output is between 1 million and 1.2 million tons. After the project is completed, it will effectively meet the electricity and steam demands of Qili Aluminium during production, ensure a higher self-sufficiency rate and a stable supply of alumina, and provide a stable and reliable energy guarantee for its sustainable development.
In recent years, WHEE has actively responded to the Belt and Road Initiative and deepened its overseas market layout. This cooperation is another important achievement of the company's deep cultivation in the Southeast Asian market, and also marks that the company's internationalization strategy has reached a new level.
相关信息
- 2026-10-14
- 2026-10-12
- 2026-09-28
- 2026-09-12
- 2026-09-11
网站导航:
-
热线电话
国内锅炉装备及技改服务:
朱亮 15152221696
国内传统电站:史云鹏13921115517
国内环境工程:史云鹏13921115517
海外业务(仅销售):高薪 15961796550;
慎睿 18626335727;
张雪兵13301514906
电解水制氢装备:
朱亮 15152221696
市场办:(0510)85215556-2206
公司电话:(0510)85215556用户服务部:(0510)85210664